2010 Stormwater Master Plan Update - Castle Rock
2011 Stormwater Wastewater Operations Compliance
2012 Stormwater Wastewater Operations Compliance
2013 Stormwater Division Operational Plan
2013-2017 Five Year UDFCD Capital Improvement Program
2013 Western Kentucky University Survey
2014-2017 UDFCD Master Planning Needs
2014 Aurora Rain Watch Training Presentation
2014 Aurora Channel Inspection Summary Log
2014 Stormwater Utility Survey (Black & Veatch)
2015-2034 Aurora Water Storm Drain Capital Improvement Program
2015-2018 Drainage System Master Planning Needs
Assessment Needs for Stormwater Assets
Aurora Development and Connection Fee Schedule 2014
Aurora September 2013 Flood Initial Report
Aurora IWMP Project Execution Plan
Aurora Municipal Code Chapter 70
Aurora Municipal Code Chapter 138
Aurora Parks and Rec Noxious Weed Level of Service
Aurora Parks and Rec Ops and Maintenance Level of Service Agreement
Aurora Resources and UDFCD Document Table
Aurora Rules and Regs for Stormwater Discharge
Aurora Standards and Specs for Water Sanitary Sewer and Storm Infrastructure
Aurora Stormwater Program and Division of Responsibilities
Aurora Water Flood Presentation (Governor)
Authorization to Discharge COA Phase I MS4 Permit
AW Department Integration Planning June 2012
Build asset database graphic, Figure 3.4
City of Aurora MS4 Final Report
City of San Diego Watershed Asset Management Plan
COA Online Civil Plan Submittal Checklist
Colorado Discharge Permit Facts 2009
Colorado Discharge Permit Facts 2011
Compliance Related Record and Document Management System Model
Conceptual Engineering Division Org Chart
City of Aurora Municipal Storm Water Inspection Report Response
Data Systems Management Model One
Data Systems Management Model Two
Documents Questionnaire Phase 1
Drainage Basin Risk Levels, Table B.6
Engineering Services Division Org Chart
EPA Flood Resilience Checklist
Establish Capital Planning & Maintenance Process, Figure 3.2
Fee Schedule Public Works Permits
Fig 5.7 CIP Project Detail Maps
Figure 3.5 Develop the Solution
Final 2013 Aurora Water and Public Works MOU Shared Responsibilities
Full Spectrum Detention Concept Paper
Getting to Engineering Records via Internet
Grand Rapids SW Asset and Capital Plan 2013
H-5 Condition and Rehabilitation Recommendation Spreadsheet
Highline Canal Feasibility Study
High Priority Use Cases, Table 3.1
Overall Basin Map w Distinguished City Limits
Phase II Conditions Assessment
Planned Residential Development Water Demand Study
Sample Seneca Major Drainageway Plan Content from UDFCD
Sitewise Final Report Wastewater and Stormsewer Rates
Spill Communication Plan and Resources
Storm Drainage Design Criteria
Stormwater GIS Based Data & Information Management System Model, Figure 3.3
Stormwater Program Master Plan Proposed Implementation Plan, Figure 3.1
Stormwater Program Organization, Figure 2.1
UDFCD Documents by Watershed, Table 2.2
USEPA Ten-Step Asset Management Process, Figure 2.2
Use Cases, Surveys, and Questionnaires, Appendix B